Scope of supply:
- 3 x Main Switchboards
- 50 x Distribution Boards
- 30 x Tee Off and Link Boxes
Overview
GEM provided the Switchboards and associated equipment for the Woolworths Moorebank National Distribution Centre. The MoNDC project included cutting edge automation technology that interfaces with the electrical infrastructure and the associated switchboards.


